NYCHA’s designated Construction Manager, the LiRo Group, awarded Twin Peaks the contract to provide Special Inspections and Construction Materials Testing services; the contract was for NYCHA’s public housing in Red Hook, Brooklyn. Due to Superstorm Sandy, there has been extensive flood and wind damage.
![](https://www.twinpeakstesting.com/wp-content/uploads/2019/05/TPI-Redhook-01.jpg)
The general scope of the project included the installation of new centralized boiler equipment and complete backup power generators in the new building above the FEMA flood level; reconstruction of playgrounds affected by the construction work; changing the roofing for 28 residential buildings; changing electrical conduits and plumbing pipes impaired by water in basement areas; designing a new boiler/standby generator plant building on Clinton St. and W. 9th St. to supply heat and power for Red Hook East and West; and much more.
![](https://www.twinpeakstesting.com/wp-content/uploads/2019/05/TPI-Redhook-03.jpg)
Twin Peaks performed many inspections and tests. A short list includes the following: Concrete field, plant, and rebar; Masonry; High-Pressure Gas and Water/Steam Pipes, Bolting, and NDT testing; Asphalt Compaction; Soil Compaction; and MEP Systems, including Mechanical, Emergency Power (Generators), Smoke Control, Heating, and Sprinkler Systems.
![](https://www.twinpeakstesting.com/wp-content/uploads/2019/05/TPI-Redhook-05.jpg)